|
||||||||||||||||||||||||||||||
|
The work in ENCAP will, by the time it is finished, be covered by over 150 deliverables (technical reports), of which very few are accessible to the public, due to the strong interest that the ENCAP partners have in the project results. In order to give the interested public an idea of the work performed within the project, public summary reports have been written based on some deliverables. Links to currently available summaries can be found below. Please note that these summaries do not give the full picture of the work performed within ENCAP, but should merely be looked upon as examples of work performed. SP1: Process and Power Systems
SP2 : Pre-Combustion Decarbonisation Technologies
SP3 : OxyFuel Boiler Technologies
SP6 : Novel Pre-Combustion Capture Concepts
|
Project Highlights 2nd Technical Training Seminar / Workshop 1st Technical Training Seminar / Workshop |
||||||||||||||||||||||||||||